How Long Does It Take To Commercially Renovate a Restaurant?

Aug 30, 2024 | Blog

Starting your renovation journey for the first time can bring excitement and anxiety, especially regarding the timeline. You have so many ideas regarding your space and wonder, “How long does it take to renovate a restaurant?” If that is the case, then this blog is meant for you.

Factors Affecting the Timeline of Restaurant Renovation

The time it takes to renovate a restaurant depends on multiple factors, from the extent of work needed to the size of your commercial property. Generally, a restaurant can take 4 to 12 weeks to renovate properly.

However, this timeframe may be less if the desired level of change is not that drastic. Usually, a kitchen takes 6 to 8 weeks to renovate, and bathrooms consume 4 to 8 weeks. But the best part is that you can get the work started in multiple places simultaneously so that everything goes swell.

  1. Restaurant Size
    There is no standard size of restaurants, and they come in all shapes and sizes. This factor influences the timeline of renovation to a considerable extent. The larger the place is, the more time it will take to finish.
  2. Extent of Renovation
    After the size of the restaurant, the extent of renovation (the need for change) determines how long this project will take. It would not take much time if you are working on making minor changes, such as just putting up a new floor or getting rid of the old door. However, a drastic difference from a rustic look to something modern requiring 360-degree modification of each and every aspect will take longer.
  3. DIY vs. Professional Workers
    This is perhaps the least talked about but impacts the entire project most. DIYs are never a good option; you may think the work is easy based on tutorials, but the reality is quite far from it.

    Renovating a restaurant yourself not only takes a very long time but also is dangerous for you. With no proper understanding and experience, you are literally blindsided and have no clue what issues might pop up while you’re at it.

    This is why hiring qualified professionals is a must. They not only know what to do and how to do it but also have the necessary equipment and tools required to safely get the work done. Safety and efficiency are prime requirements to get the type of results you need.

Restaurant Renovation Timeline

Here’s a brief breakdown of the entire process:

Part 1: Planning and Designing (1 Month)

It starts with properly planning how much and what areas you want to renovate your restaurant. The entire project needs proper discussion on the design, materials needed, budget, and final look. Additionally, this phase also includes your professional contractor gathering all the permits needed to get the work started.

Part 2: Demolition and Initial Construction (2 to 5 days)

Once you are through the preconstruction phase, it is time to start step 2 – demolition and construction. You can expect the expert contractors to tear down everything they need within this span. After the old structure was taken down, they set a new foundation to rebuild it all.

Part 3: Installation and Final Touches (5 to 15 days)

This is the final stage where the fittings take place: lighting, sinks, cabinets, tubs, garbage disposal, everything! Installation of items mainly depends on how much they are in number. Generally, this part takes around 5 to 15 days and an additional 2 weeks for final touches.

Closing Note

All in all, sparing 4 to 12 weeks’ time for a restaurant renovation is a must; however, it may take more or less depending on the amount of work and size of the place. If you have more questions, talk to professionals at Advanced Construction and Development by dialing (936) 521-2446. Or, you can drop by our office in Texas for assistance.